    车库坡道为什么采用无震动防滑环氧坡道地坪呢?

    2019-03-22 08:10:46 无锡盛发地坪科技竞彩足球 阅读

    车库坡道为什么采用呢?首先是功能性。坡道上下坡比较频繁,易摩擦,如果采用密封固化剂地坪环氧地坪摩擦系数低,车子很容易发生打滑,出现意外。如果碰到下雨天,车轮上有水,车轮止滑更差,不利于行车安全,所以采用止滑性能好,耐磨性能优的环氧防滑是首选,而且环氧防滑地坪价格适中,又满足行车安全需求,基本上是中国目前车库坡道的常规方案。其主要工艺如下:

    Why does the garage ramp use non-vibration and non-skid epoxy ramp floor? The first is functionality. Slope downhill more frequent, easy to friction, if the use of sealant curing agent floor, floor friction coefficient is low, the car is prone to slip, accident. If there is water on the wheels on rainy days, the anti-skid of the wheels is worse, which is not conducive to driving safety. Therefore, the epoxy anti-skid floor with good anti-skid performance and excellent wear resistance is the first choice, and the price of the epoxy anti-skid floor is moderate, and it meets the requirements of driving safety. It is basically the conventional scheme of garage ramp in China at present. The main processes are as follows: (一)素地处理:
    (1) plain treatment:
     
    1、地面凸出物用砂盘机或刮铲磨平铲平;
    1. The protrusions on the ground are leveled by grinding machine or scraper.
     
    2、地面裂缝需预先用无溶剂树脂材料补平;
    2. Ground cracks need to be repaired with solvent-free resin materials in advance.
     
    3、排水口及固定设施与待施工区域交接部分须预先做好防护措施;
    3. Pre-protection measures should be taken for the junction of drainage outlet and fixed facilities with the area to be constructed.
     
    4、施工前地面含水率需在6%以下,并保持干燥;
    4. Ground water content should be below 6% before construction and keep dry.
     
    5、使用打磨机处理:
    5. Use grinder to deal with:
     
    a. 使用打磨机前应计划好施工路线及相关电源连接设施;
    Before using the grinder, the construction route and related power supply connection facilities should be planned.
     
    b. 电源使用220V电压,使用功率在7KW以内;
    B. The power supply uses 220V voltage and the power is less than 7KW.
     
    c. 操作人员严格按照打磨机的使用说明及安全注意事项操作;
    C. Operators should strictly follow the operation instructions and safety precautions of the grinder.
     
    d. 打磨效果以达到施工要求的素地为原则;
    D. The principle of grinding effect to meet construction requirements is plain land.
     
    6、素地处理时需注意施工时所造成的粉尘污染,必要时需管制作业人员;
    6. Dust pollution caused by construction should be paid attention to in plain land treatment, and operators should be controlled when necessary.
     
    7、素地处理完成后需严格管制进出人员,非工作人员严禁进入管制区域。
    7. After plain processing is completed, the entry and exit personnel shall be strictly controlled, and non-staff members shall be strictly prohibited from entering the controlled areas.
     
    (二)底涂层FMK1100的施工:
    (2) Construction of bottom coating FMK1100:
     
    1、无振动防滑坡道施工前需计算材料使用量,依照无振动止滑坡道施工方向及区域选定材料搅拌区和材料配置;
    1. Material usage should be calculated before construction. Material mixing area and material allocation should be selected according to construction direction and area.
     
    2、依比例将主剂及固化剂充分搅拌均匀;
    2. Mix the main agent and curing agent in proportion.
     
    3、将搅拌好的材料送至施工区域内;
    3. Send the stirred materials to the construction area.
     
    4、涂布底涂时采用毛刷及滚筒,将材料均匀涂布;
    4. Brush and drum are used to coat the material evenly.
     
    5、搅拌后的材料应在可规定使用时间内使用,以免材料固化;
    5. The stirred material should be used within the prescribed time to avoid solidification of the material.
     
    6、施工中发现沙粒或杂质应立即去掉;
    6. Sand grains or impurities found in construction should be removed immediately.
     
    (三)、伸缩缝处理
    (3) Treatment of expansion joints
     
    1.使用高强伸缩布带贴补上伸缩缝上面可以很好的防止裂隙产生
    1. The use of high-strength stretching tape to patch the top of the expansion joint can prevent the formation of cracks very well.
     
    2.施工前计算材料的使用量,依照施工方向及区域,配合施工路径选
    2. Calculate the usage of materials before construction, according to the direction and area of construction, and cooperate with the selection of construction paths.
     
    定搅拌区;
    Fixed mixing zone;
     
    3.依照比例将主剂及固化剂充分搅拌均匀;
    3. Mix the main agent and curing agent fully and evenly according to the proportion.
     
    4.材料混合后,依正确比例将石英沙缓慢加入,并搅拌均匀;
    4. After mixing, the quartz sand is added slowly in the correct proportion and stirred evenly.
     
    5.把材料压入缝隙,把布带贴补上;
    5. Press the material into the gap and patch the tape.
     
    6.施工涂布时材料需尽快送到施工区域内,依照施工程序施工;
    6. Material should be sent to the construction area as soon as possible and constructed according to the construction procedure.
     
    7.完全固化后,打磨处理,使地坪更加平整。
    7. After fully solidified, the ground is polished to make the floor smoother.
     
    (四)砂浆层FMK2100的施工:中涂材料+ 防滑砂
    (4) Construction of Mortar Layer FMK2100: Medium Coating Material + Anti-skid Sand
     
    1.施工前计算材料的使用量,依照施工方向及区域,配合施工路径选定搅拌区;
    1. Calculate the amount of material used before construction, and select the mixing area according to the direction and area of construction and the construction path.
     
    2.依照比例将主剂及固化剂充分搅拌均匀;
    2. Mix the main agent and curing agent fully and evenly according to the proportion.
     
    3.材料混合后,依正确比例将防滑砂缓慢加入,并搅拌均匀;
    3. After mixing, the anti-skid sand is added slowly and stirred evenly according to the correct proportion.
     
    4.搅拌均匀的材料,采用镘刀等工具,将材料均匀涂布;
    4. Mixing uniform materials, using tools such as trowels, uniformly coating materials;
     
    5.施工涂布时材料需尽快送到施工区域内,依照施工程序施工;
    5. Material should be sent to the construction area as soon as possible and constructed according to the construction procedure.
     
    6.涂布中涂时减少施工结合缝;
    6. Reduce the construction joint in the middle coating.
     
    7.施工涂布时应注意施工温度,低于5℃时环氧树脂不能固化;
    7. When coating, attention should be paid to the construction temperature, and the epoxy resin can not be cured when the temperature is lower than 5 C.
     
    8.混合后的材料应在规定使用时间内涂布完毕,并注意前后组材料的衔接;
    8. Mixed materials should be coated within the prescribed time, and attention should be paid to the cohesion of the front and back groups of materials.
     
    9.施工中发现杂质应立即去除;
    9. Impurities found in construction should be removed immediately.
     
    10.施工期间及养护时间内管制人员进出,如施工时温度在10℃—15℃时,养护时间为24—48小时;
    10. During the construction period and maintenance time, when the construction temperature is 10-15 C, the maintenance time is 24-48 hours.
     
    (五)对防滑砂层加固处理
    (5) Reinforcement of Anti-skid Sand Layer
     
    1.施工前计算材料的使用量,依照施工方向及区域,配合施工路径选定搅拌区;
    1. Calculate the amount of material used before construction, and select the mixing area according to the direction and area of construction and the construction path.
     
    2.依照比例将主剂及固化剂充分搅拌均匀;
    2. Mix the main agent and curing agent fully and evenly according to the proportion.
     
    3.搅拌均匀的材料,采用镘刀等工具,将材料均匀涂布;
    3. Mixing uniform materials, using tools such as trowels, uniformly coating materials;
     
    4.施工涂布时材料需尽快送到施工区域内,依照施工程序施工;
    4. Material should be sent to the construction area as soon as possible and constructed according to the construction procedure.
     
    5.涂布中涂时减少施工结合缝;
    5. Reduce the construction joint in the middle coating.
     
    6.施工涂布时应注意施工温度,低于5℃时环氧树脂不能固化;
    6. When coating, attention should be paid to the construction temperature, and the epoxy resin can not be cured when the temperature is lower than 5 C.
     
    7.混合后的材料应在规定使用时间内涂布完毕,并注意前后组材料的衔接;
    7. Mixed materials should be coated within the prescribed time, and attention should be paid to the cohesion of the front and back groups of materials.
     
    8.施工中发现杂质应立即去除;
    8. Impurities found in construction should be removed immediately.
     
    9.施工期间及养护时间内管制人员进出,如施工时温度在10℃—15℃时,养护时间为24—48小时;
    9. During construction and maintenance time, when the temperature of construction is 10 ~15 ~C, the maintenance time is 24-48 hours.
     
    (六)面涂层FMK301的施工:
    (6) Construction of surface coating FMK301:
     
    1.施工前计算材料的使用量,依照施工方向及区域,配合施工路径选定搅拌区;
    1. Calculate the amount of material used before construction, and select the mixing area according to the direction and area of construction and the construction path.
     
    2.依照比例将主剂及固化剂充分搅拌均匀;
    2. Mix the main agent and curing agent fully and evenly according to the proportion.
     
    3.搅拌均匀的材料需尽快送到施工区域内,依照施工程序施工;
    3. Material with uniform mixing should be sent to the construction area as soon as possible and constructed according to the construction procedure.
     
    4.涂布面涂材料时,采用滚筒,将材料均匀涂布;
    4. When coating material, the roller is used to uniformly coat the material.
     
    5.施工涂布时应尽量减少施工结合缝;
    5. The construction joints should be minimized during coating.
     
    6.施工涂布时应注意施工温度,低于5℃时环氧树脂不能固化;
    6. When coating, attention should be paid to the construction temperature, and the epoxy resin can not be cured when the temperature is lower than 5 C.
     
    7.混合后的材料应在规定使用时间内涂布完毕,并注意前后组材料的衔接;
    7. Mixed materials should be coated within the prescribed time, and attention should be paid to the cohesion of the front and back groups of materials.
     
    8.施工中发现杂质应立即去除;
    8. Impurities found in construction should be removed immediately.
     
    9.施工期间及养护时间内管制人员进出,如施工时温度在10℃—15℃时,养护时间为24—48小时.
    9. During the construction period and maintenance time, when the temperature is between 10 and 15, the maintenance time is between 24 and 48 hours.