    无震动止滑坡道施工和施工后验收常识

    2019-03-22 08:08:37 无锡盛发地坪科技竞彩足球 阅读

    对于无震动止滑坡道的施工人员来说,有一些必要的常识是必须要了解的,本问为您解答,无震动止滑坡道施工和验收常识。第一. 施工阶段的常识1、完工后,由于表面粗糙不宜清洁,在不对车道加以保护遮盖的情况下,不宜进行墙面粉刷等其他可能对表面造成污染的施工项目。2、有关工期需在施工前7天通知我方相关人员,以便准备。3、施工现场请甲方提供现场室内材料堆放处,设备用具仓库兼施工人员住宿,以及水电和夜间施工照明。4、施工过程中,应避免交叉作业。若在户外施工,雨天应停止施工。

    For the construction personnel of non-vibration stop landslide, there are some necessary common knowledge that must be understood. This question is for you to answer, non-vibration stop landslide construction and acceptance of common knowledge. First, common sense of construction stage 1. After the completion of landslide without vibration, because the surface is rough and not suitable for cleaning, it is not appropriate to carry out wall painting and other construction projects which may pollute the surface without protecting and covering the lane. 2. The relevant construction period shall be notified to our relevant personnel 7 days before the construction for preparation. 3. On the construction site, Party A is requested to provide on-site indoor material storage, equipment warehouse and construction personnel accommodation, as well as hydropower and night construction lighting. 4. In the process of construction, cross-operation should be avoided. If construction is carried out outdoors, construction should be stopped in rainy days.
    第二. 验收阶段的常识1、检查各项目,当遇有疑问时,应与专管人员协商并提出对策。2、表面施工情况,有无剥落,损伤。3、我方保证地面的技术指标符合技术资料说明。4、每场施工结束,填写地面施工日报表,最终验收,以上述地面施工单位报表为依据。
    Second, the general knowledge of the acceptance stage 1. Check the items, when in doubt, should consult with the competent personnel and propose countermeasures. 2. Surface construction conditions, whether there is peeling, damage. 3. We guarantee that the technical specifications of the ground meet the specifications of the technical data. 4. At the end of each construction, fill in the daily report form of ground construction, and finally check and accept it, based on the report form of the above ground construction units.
    验收是工程的最后一个环节,也是把关环节,如果在施工过程中有哪些欠缺或者失误,最好在验收前处理好.给客户一个安全的坡道。
    Acceptance and acceptance is the last link of the project and also the key link. If there are any shortcomings or mistakes in the construction process, it is best to deal with them before acceptance and give customers a safe ramp. 